Skip to content

24/7 emergencies

Tu Electricista
en Málaga
Electrician working with a power drill

Rewiring and electrical renovations in Málaga

We rewire older flats, kitchens and bathrooms: new cabling, earthing, fuse box, switches and sockets, in phases or all at once.

  • 24/7 electrical emergencies, 365 days a year
  • Fixed price agreed before we start
  • From Estepona to Rincón de la Victoria and Ronda

24/7 electrical emergencies, 365 days a year · All other jobs by appointment, with a fixed quote

Quote for rewiring and renovations

Free and with no obligation. For an emergency, we call you back straight away, day or night.

What do you need?

In case you'd rather we reply by email.

    + Tell us briefly (optional)

    Your details are only used to handle your quote. No spam.

    Many flats in Málaga built before the 1990s still have installations designed for one bulb per room and a fridge: fabric-covered or perished rubber cable, sockets with no earth and a single circuit for the whole home.

    If you're renovating, that's the time to redo the electrics: with the walls open it costs far less. We can also work in phases (fuse box and earthing first, then kitchen and bathrooms) if the property is occupied.

    Socket mechanisms installed before fitting the cover plates

    Signs your installation is out of date

    Sockets with no earth

    Two-pin sockets or sockets with no real earth connection.

    Fabric or stiff rubber cable

    Aged insulation that cracks when you touch it.

    A single circuit

    Everything depends on one breaker: if it trips, the whole house goes off.

    Extension leads everywhere

    Too few sockets, badly placed for today's needs.

    Bathroom without proper protection

    Sockets or lights in splash zones.

    You're planning building work

    Kitchen, bathroom or full renovation: the best time to rewire.

    What a complete rewire includes

    • Removal of old cabling and new halogen-free wiring.
    • Separate circuits in line with ITC-BT-25 (lighting, sockets, cooker…).
    • Earthing on every socket and connection to the building's earth.
    • New fuse box with RCDs and surge protection.
    • New switches and sockets, and repositioning of sockets and light points.
    • Installation certificate on completion.
    Flush-mounted wall boxes set into the wall

    How we organise the renovation

    1. 1

      Visit and points plan

      We walk round the property with you and mark where you want each socket and light.

    2. 2

      Quote by phases

      A fixed price, for the whole job or in phases if the property is occupied.

    3. 3

      Coordinated works

      We work in the right order alongside the other trades.

    4. 4

      Certificate and guarantee

      Testing, installation certificate and a written guarantee.

    Regulations for kitchens and bathrooms

    In bathrooms, ITC-BT-27 defines zones around the bath or shower in which sockets and certain appliances cannot be installed. That's why, when renovating a bathroom, it's worth reviewing the position of every socket and light.

    In kitchens, the hob and oven need their own 6 mm² circuit protected at 25 A, and the washing machine, dishwasher and water heater another at 4 mm². If your kitchen has a single circuit for everything, that's the most common reason the power trips when cooking.

    Frequently asked questions

    How much does it cost to rewire a whole flat?

    In Málaga, a 70–90 m² flat usually costs between €2,500 and €4,500 plus VAT, including wiring, switches and sockets, and fuse box. The price depends mainly on the number of points and whether the walls are already open for other work.

    Can it be rewired without building work?

    Partly. If the existing conduits are in good condition, the property can be rewired without breaking into walls. Where there's no conduit or it's blocked, small chases are needed, which are filled and left ready for painting.

    Can I live at home during the work?

    Yes, if we do it in phases. We organise the work by area so you always have power in most of the property.

    How long does it take?

    A medium-sized flat usually takes between 4 and 8 working days, depending on the number of points and the condition of the conduits. A kitchen or bathroom takes 1 to 2.

    Will you give me a certificate when you finish?

    Yes. When we rewire the installation we issue the corresponding certificate, which will also be useful if you need to increase your power or change the account holder.

    Where we provide this service

    From Estepona to Rincón de la Victoria and inland to Ronda: the western Costa del Sol, Málaga city, the Guadalhorce Valley, the Sierra de las Nieves and the Serranía de Ronda. Emergencies 24/7; other jobs by appointment.

    Socket mechanisms installed before fitting the cover plates

    Request a quote for rewiring and renovations

    Leave us your phone number. If it's an emergency, we call you back straight away, day or night; for any other job, we'll arrange an appointment and a fixed-price quote.

    Get a quote
    Get a free, no-obligation quote